4 month project with Exeter City council (ECC) estates, carrying out detailed analysis of the energy data from 5 sites. Designed a smart system with battery storage (500 KW/500 kWh) for a site with existing 1.5 MW solar installation. The outcomes were better utilisation of on-site generation, savings on bills and provision of additional income through ancillary services to grid with energy trading.